In the decoration, the owner's main work is to supervise the construction and quality acceptance. Whether it is to supervise the construction or the acceptance after completion, the owner needs to know some decoration knowledge. The quality of decoration affects the safety and quality of your future home life. Take care of these "three passes" and have a safe home

in the decoration, the main work of the owner is to supervise the construction and quality acceptance. Whether it is to supervise the construction or the acceptance after completion, the owner needs to know some decoration knowledge. The quality of decoration affects the safety and quality of your future home life. Take care of this “ Three levels ” Have a safe home

the first step is the acceptance of materials. When the formal decoration company signs the contract with the customer, it will sign a material description sheet at the same time, detailing the brand, specification and quality grade of the required materials. Both parties should accept the materials according to the material description sheet. Due to the limited space on the construction site, the materials will be accepted several times. Generally speaking, the materials to be checked and accepted before construction include water pipes, wires, wood boards, putty, cement, sand, etc. as the project progresses, tiles, paints, coatings, etc. will be checked and accepted in the later stage

agree on the time of material acceptance: after material procurement, the purchaser shall notify the other party of the contract to prepare for material acceptance, preferably when the material enters the site. The agreed acceptance time is very necessary to avoid that when the materials enter the site, the other party has no time to accept the materials, which will affect the construction progress

the acceptor specified in the contract must be present: both people in the home decoration industry and consumers should take it seriously to avoid unnecessary troubles or disputes in the later stage

the acceptance procedure must be strict: the acceptor should carry out necessary inspections on each material specified in the contract, such as brand, quality, specification and quantity

the acceptor specified in the contract shall sign on the acceptance sheet: if the inspection results show that the materials are qualified, the acceptor shall sign on the material acceptance sheet. If the owner finds that the mobilized materials are inconsistent with the provisions of the contract, he can refuse to sign on the material acceptance sheet until it is negotiated with the home decoration company

key acceptance of concealed works in the second pass

the supervising engineer introduced that when the concealed works are carried out or completed, a medium-term key acceptance should be carried out, which is particularly important to ensure the overall quality of home decoration. Whether the acceptance is qualified or not will affect many home decoration projects in the later stage. Generally, the mid-term acceptance of home decoration can be carried out in about 15 days (the villa construction time is relatively long), which can be carried out in two times. The first acceptance involves ceiling, water circuit, wood products and other items, and the second acceptance is dedicated to the inspection of waterproof rooms used in home decoration. If you find problems or want to make some local changes, it is best to put forward them in time at this stage

circuit transformation: when checking and accepting the circuit, we must pay attention to whether the wires used are of the specified brand and whether the wires meet the standards. Substandard wires have thick skin and thin copper core or thin skin and thick copper core. These two substandard wires have an impact on the current load, resulting in potential safety hazards for the owner in future use. When checking the circuit transformation, we should also check the closure of the socket. If the original socket is displaced, the displaced part should be treated with moisture-proof and waterproof treatment, and should be sealed with more than 3 layers of waterproof tape. At the same time, check whether the circuit connector in the ceiling is also treated with waterproof tape

waterway reconstruction: the inspection of waterway reconstruction is mainly to carry out the pressure test. The pressure during pressure shall not be less than 6kg, and the pressure time shall not be less than 15 minutes. Then check whether the pressure gauge has pressure relief. If there is pressure relief, check whether the valve is closed. If there is water leakage in the pipeline, deal with it before the next construction

waterproof: generally, rooms with floor drains should be waterproof. Whether the waterproof is in place will not only affect the daily life of the owner, but also affect the interests of downstairs neighbors. Closed water test is a common method to test waterproofing in home decoration. During the closed water test, the foreman needs to confirm the closed water time with the owner and the downstairs residents at the same time, then close the drain hole of the room and put the water into the room (the water surface height is not less than 3cm), and check or ask the downstairs residents whether there is leakage after 24 hours

when checking and accepting the waterproof of the shower wall, you can first check whether the paint on the wall is uniform and whether there is missing painting, especially whether the internal and external corners are missing painting, so as to prevent the internal and external corners from being damp and moldy due to missing painting waterproof paint. The waterproof height of the shower wall is usually about 1.8m, and that of other areas should be higher than 1.5m